Projects


YMCA of Yakima - Chesterley

Yakima, WA

We had our Interlock and Water Level Controllers installed on each of the four systems along with our Feature Pump Controller installed on their Activity Pool that included two water slides, lazy river, activity feature, and a play structure feature.

YMCA of Everett

Everett, WA

We had our Interlock and Water Level Controllers installed on each of the three systems along with our Feature Pump Controller installed on their Activity Pool that included a lazy river and multiple spray features.

William Shore Aquatic Center

Port Angeles, WA

FIC-SF and SL500 installed on the pre-existing lap pool at the William Shore Aquatic Center.

FIC-SF and SL500 installed on the pre-existing lap pool at the William Shore Aquatic Center.

We had our Interlock and Water Level Controllers installed on each of the four systems along with our Feature Pump Controller installed on their Activity Pool that included two water slides, lazy river, activity feature, and a play structure feature.

Emerald Queen Casino

Tacoma, WA

FIC-SF at the Emerald Queen Casino.

FIC-SF at the Emerald Queen Casino.

We had our Interlock and Water Level Controllers installed on each of the four systems along with our Feature Pump Controller installed on their Activity Pool that included two water slides, lazy river, activity feature, and a play structure feature.

Art Dague Pool

Rifle, CO

FIC-SF and SL500 on four systems along with our Pool Pumps Emergency Shut Off Panel.

Kerville Croc Center

Kerville, TX

FIC-RF and SL500 were installed on this project.